Optimizing For Happiness
  • Home
Sign in Subscribe

threads

A collection of 1 post
Running Test In Parallel - Optimal Number Of Threads
automated testing

Running Test In Parallel - Optimal Number Of Threads

June this year I presented at expo:QA conference [http://www.expoqa.com/expoqa16/en.html]. It was a case study on how we increased the execution time of high level automation tests more than 60 times [https://speakerdeck.com/emanuil/need-for-speed-accelerate-tests-from-3-hours-to-3-minutes] . Last week I received an email from one
20 Oct 2016 6 min read
Page 1 of 1
Optimizing For Happiness © 2025
Powered by Ghost